Cast in place concrete quality matching precast production
Having a long term mindset conscious of quality and long term maintenance, our institutional client recognized cast in place concrete as the right solution. The Adjustable team challenged the notion that prefabricated systems such as precast concrete, which is commonly used in suburban parking structures, achieves a higher level of production. The result was a high quality asset delivered to market faster to support continued growth at the Lake Forest Hospital Campus.